CT 1500 kW

Ensures optimal performance and hardware longevity with a durable build, advanced airflow, and customizable features. Maximizes operational efficiency in demanding mining environments. mining environments.
No items found.
CT 1500 kW
The 1.5 MW Air Unit is an innovative and high-efficiency cooling solution designed for large-scale bitcoin mining operations. This unit addresses the critical need for temperature control in mining environments, ensuring optimal performance and increased hardware longevity. Built with industrial-grade durability, advanced airflow technology, and customizable features, the 1.5 MW Air Unit stands out as a powerful tool to maximize operational efficiency while minimizing energy consumption.

Specs

▫️ Welded Roof & Construction: Fully laser-welded galvanized roof for durability and all-weather protection.

▫️ Built-In Networking & Cable Management: Rack-mounted switch slots and cable guides for clean, organized connectivity.

▫️ Compliant Access Doors: Egress-compliant doors designed for safety and accessibility.

▫️ UL-Certified Components: Electrical systems built with UL-certified breakers and parts.

▫️ VFD Fan Control (Optional): Variable Frequency Drive available for energy-efficient airflow management.

▫️ Galvanized Intake Louvers: Dust- and debris-resistant design with 24”x24” filter housing support.

▫️ High Slot Capacity: Fits 420 S19 miners or 504 M60s, optimized for cooling and space.

▫️ Industrial Dimensions: 40' L x 9'4" W x 9' H — ideal for scalable mining deployments.

*Customizable options available. Contact the CryptoTherm team to explore the best solutions tailored to your needs.

Specs

▫️ Welded Roof & Construction: Fully laser-welded galvanized roof for durability and all-weather protection.

▫️ Built-In Networking & Cable Management: Rack-mounted switch slots and cable guides for clean, organized connectivity.

▫️ Compliant Access Doors: Egress-compliant doors designed for safety and accessibility.

▫️ UL-Certified Components: Electrical systems built with UL-certified breakers and parts.

▫️ VFD Fan Control (Optional): Variable Frequency Drive available for energy-efficient airflow management.

▫️ Galvanized Intake Louvers: Dust- and debris-resistant design with 24”x24” filter housing support.

▫️ High Slot Capacity: Fits 420 S19 miners or 504 M60s, optimized for cooling and space.

▫️ Industrial Dimensions: 40' L x 9'4" W x 9' H — ideal for scalable mining deployments.

*Customizable options available. Contact the CryptoTherm team to explore the best solutions tailored to your needs.

GET A QUOTE

Data Center & Other Offerings

Hybrid 200 kW

Hybrid data center with 200 kW natural gas generator, air cooling, and hydraulic lift system. Fast deploy, relocates easily, and delivers efficient, reliable power for small to mid-scale Bitcoin mining operations.

CT 1500 kW

Ensures optimal performance and hardware longevity with a durable build, advanced airflow, and customizable features. Maximizes operational efficiency in demanding mining environments. mining environments.

Immersion Vault

High-density vault with 14 tanks, each holding up to 18 miners. Utilizes CTcool fluid for efficient heat removal, supports overclocking firmware, and includes all key components for reliable and quiet operation.

Pickaxe 250 kW

High-density rack container with 250 kW capacity, 220U of server space, smart airflow design, and support for S21 and M30 miners. Stackable, extendable, and designed to perform in a compact footprint.

ALL PRODUCTS